Do you want to introduce advanced industrial air coolers but are deterred by the complicated import procedures and potential risks? Qualification handling, environmental protection filing, logistics supervision... Every link is crucial.
(1) Access Qualifications and Compliance Management
(2) Financial Risk Control
Custom - made shock - proof packaging (ISTA 3A transportation test certification)
Stage | Key operations | Time Limit | Define the boundary of agency responsibilities |
---|---|---|---|
Contract signing | Agree on the place of dispute resolution Review the foreign merchants business registration (Verify the authenticity of the VAT number) | 3 - 5 working days | Production Supervision |
Factory inspection (Detect that the wall thickness of the evaporator copper tube ≥ 0.5mm) | Third - party energy efficiency testing (COP value ≥ 3.2) Retain production video records for future reference | 15 - 20 working days | International Transportation |
Conduct pre - shipment inspection (China Certification & Inspection Group) | Issue a clean bill of lading Record the container seal number for the record | 30 - 45 days (European route) | Customs Clearance and Acceptance |
Declare HS code 84186190 (Cooling capacity > 4,000 kcal/hour) | Handle the approval of the duty - free form (Applicable to scientific and educational tax exemption) Key points of customs inspection: Consistency of energy efficiency labels | 5 - 7 working days | Establish a local spare parts warehouse (Reserve ≥ 10% of vulnerable parts) |
After - sales follow - up | Coordinate the entry of foreign engineers (Apply for a Z - visa) The release of the quality guarantee deposit requires a full - load operation test | 12 months | Agent Selection |
Note: For special users such as universities, the Tax - free Equipment Life - cycle Management System can be activated to automatically track the customs supervision period (usually 5 years). For large industrial air coolers (refrigeration capacity > 200kW), an additional Import License for Key Old Mechanical and Electrical Products needs to be processed.
? 2025. All Rights Reserved. 滬ICP備2023007705號-2 PSB Record: Shanghai No.31011502009912